It’s July 2019; My Thoughts This Month….

It’s July 2019; My Thoughts This Month….

The Federal Government has approved the Trans Mountain Pipeline again.  Yeah… us Albertan’s are looking forward to driving along the right of way and watching the side boom’s laying the pipe in the trench. Lots of side boom’s, lots of pipe and a big long trench, 1150 km. 

During this complicated and lengthy process I’ve been puzzled by contradictions:

We haul oil by truck and generate carbon.

We haul oil by rail and generate carbon.

We’ve been cutting down trees that would absorb carbon and building pipe yards in B.C. to store all the pipe Trans Canada ordered, purchased and paid for from China and India; when the pipeline was initially approved by the Federal Government in 2016.

Read More

We are the oil and gas experts

We are the oil and gas experts

At Intercon Messaging we know the oil and gas industry. Our operations are based in Drayton Valley, Alberta, about an hour’s drive southwest of Edmonton. We are at the heart of the Pembina Oilfield in beautiful Brazeau County. We have spent close to two decades working to help meet the needs of the petroleum sector both in Alberta and right across Western Canada. 

Read More

Intercon Messaging: working hand in hand with the oil and gas industry

Intercon Messaging: working hand in hand with the oil and gas industry

Around the clock facility monitoring plays a vital role in preventing safety issues, limiting equipment damage and protecting the environment and the public while meeting standards set out by government regulators. These are many of the ways Intercon Messaging works hand in hand with oil and gas companies. 

Read More